2025-February
River Oaks Church - Updated February 2025
- Auditorium
- Installed and routed new fill speakers so Dave can mix from the booth
- Rewired the PA to run off of Q-SYS now
- Removed an audio snake on the stage, repatched and consolidated stagebox inputs
- Consolidated old audio cabling in the audio rack
- Stress tested and configured a secondary Dante network to prevent audio outages from occurring.
- Live Stream Office
- Rewired the Green Room’s audio feed to get fed from the new live stream office (ran cables for it)
- Installed 3 TVs
- Ran SDI cabling and crimped the cables to get video feeds to the office
- Ran ethernet and fibers to the office
- Ran communication audio cables to the live stream office
- Moved the secondary graphics mac into the live stream office
- Created a nice cable loom of all of the connections into and out of the live stream office
- John said the desk is almost ready to install!
- Security Cameras
- Ordered 7 cameras to replace Nest cameras
- Installed 2 replacement cameras (kids hallway, kids lobby)
- Auditorium Video rack
- Rewired some video connections
- Consolidated and removed old cabling
- Reconfigured downstream and upstream keys on the video switcher to improve keying quality
- Easter LED motor project
- Dave rewrote some of my code to improve it and have better limiting on how far the motor goes, working with some companies who will provide equipment for the project